|
S |
M |
T |
W |
T |
F |
S |
12
|
13
|
14
|
15
|
16
|
17
Scientists
prepare ship for departure
|
18
Ship departed Seattle, WA 8:00pm
(transit to Endeavour)
|
19
Dive 852 at Endeavour Main Vent
Field
|
20
Dive 852 ends (~12 hours). Buoy at Cobb recovered
|
21
Dive
853 to Ashes Vent Field (fluid sampling)
|
22
Dive 854 at Virgin vent installing RAS for NeMO Net 2004
|
23
Dive 855 for pressure readings begins
|
24
Dive 855 ends after 39 hours; MTRs & limpet boxes swapped
|
25
NeMO Net buoy and BPR deployed; 2 current
meters recovered
|
26
Fluid sampling in 1998 lava flow vents, Dive R856
|
27
R857 fluid sampling at lava flow, RAS
visit and found Rumbleometer
|
28
Mapping and CTDs enroute home.
|
29
End NeMO expedition: Ship
arrives in Newport, OR
|
30
|
1
|
2
|