background banner image
spacer
horizontal bar
spacer
NeMO home About NeMO Expeditions NeMO Net Explorer Dive! Education
spacer image
horizontal bar
spacer image
  Big Calendar
Click on date to go to logbook entry:
 
 
September/October 2004
S M T W T F S
12
13
14
15
16
17
Scientists prepare ship for departure

18
Ship departed Seattle, WA 8:00pm (transit to Endeavour)

19
Dive 852 at Endeavour Main Vent Field
20
Dive 852 ends (~12 hours). Buoy at Cobb recovered
21
Dive 853 to Ashes Vent Field (fluid sampling)
22
Dive 854 at Virgin vent installing RAS for NeMO Net 2004
23
Dive 855 for pressure readings begins
24
Dive 855 ends after 39 hours; MTRs & limpet boxes swapped
25
NeMO Net buoy and BPR deployed; 2 current meters recovered

26
Fluid sampling in 1998 lava flow vents, Dive R856

27
R857 fluid sampling at lava flow, RAS visit and found Rumbleometer

28
Mapping and CTDs enroute home.

29
End NeMO expedition:
Ship arrives in Newport, OR

30
1
2
 
NeMO Home |About NeMO | Expeditions | NeMO Net | Explore | Dive! | Education
spacer
horizontal bar
spacer
spacer imagePrivacy Policy | Disclaimer | oar.pmel.vents.webmaster@noaa.gov